Running out of stock? When to reorder, and how much

Products run out because ordering is done from memory, with no point that says "at this level, order now". The fix is to set a reorder point for each product — average daily sales times the number of days your supplier (the business you buy from) takes to deliver, plus safety stock — and a reorder level. When stock falls to the reorder point, order enough to bring it back up to that level, after deducting anything already ordered but not yet delivered.

Working out the reorder point

Reorder point = average daily sales × days waiting for delivery + safety stock

ItemExample: drinking water, 12-bottle packs
Average sales per day20 packs
Supplier delivers after ordering in3 days
Safety stock (enough for 2 more days of sales)40 packs
Reorder point20 × 3 + 40 = 100 packs
Reorder level (10 days of sales + safety stock)20 × 10 + 40 = 240 packs

When 100 packs are left and nothing is already on order, order 240 − 100 = 140 packs. If the supplier sells cartons of 10 packs, order 14 cartons (round up if it doesn't divide evenly).

Mistakes that cause stockouts or dead stock

  • Forgetting what is already on order — ordering again because the goods haven't arrived yet.
  • One figure for every branch — even though each branch sells different amounts.
  • Not adjusting for the season — using normal-period reorder points for products that sell well at festival time.
  • The same reorder point for every product — slow sellers should carry little stock, fast sellers need more safety stock.
  • System stock that doesn't match the shelves — even the best reorder point is useless; count and adjust regularly.

Where Magbiz helps

  • Set a reorder point and reorder level for each product, per warehouse.
  • A low-stock report lists products that have reached their reorder point, with an alert on the home page.
  • Purchase requisitions are drafted from low-stock items for you: the quantity to order deducts anything already requested or on order, is rounded to the product's purchase unit, and is split by supplier from the supplier price list (packages with purchasing).
  • Outstanding purchase orders show whether goods already ordered have been fully delivered.
Related questions

Frequently asked

How often should we review reorder points?

At least every quarter, and whenever sales change noticeably — for example at festival time, or when a supplier changes its delivery time.

How do we set a reorder point for a new product with no sales yet?

Start from the figures of a similar product, set it low, and adjust once you have one or two months of real sales.

Can every branch use the same reorder point?

It's better not to. Each branch sells different amounts, so set them separately for each branch's warehouse, and let the central warehouse place the combined orders.

Free 30-day trial

Ready to run your business
in one system?

Sign up for a trial yourself right now, or ask about pricing and custom work — use whichever channel suits you.